
2026 Latest E-S4CON-2505 dumps Exam Material with 42 Questions
SAP E-S4CON-2505 Questions and Answers Guarantee you Oass the Test Easily
NEW QUESTION # 17
During a SUM run, you want to check if the PARCONV_UPG phase is still running property. Where can you find information about this? Note: There are 2 correct answers to this question.
- A. Check the latest log files in the SUM directory, subdirectory a bap, subdirectory tmp.
- B. Check the running batch job via Job Overview (SM37).
- C. Check for running R3trans processes on the host where SUM is running
- D. Check for running R3load processes on the host where SUM is running
Answer: A,B
NEW QUESTION # 18
You are performing an SAP S/4HAN A conversion with DMO. You are using the downtime-optimized data conversion (DoC).
Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.
- A. Software update
- B. Conversion
- C. Main import
- D. Migration
Answer: B,D
NEW QUESTION # 19
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?
- A. EU_CLONE MIG_DT_CREATTE
- B. EU CLONE MIG_DT_RUN
- C. EU IMPORT ALL
- D. EU_CLONE MIG SOT RUN
Answer: B
NEW QUESTION # 20
Which of the following scenarios does Software Update Manager cover? Note: There are 2 correct answers to this question
- A. Conversion to SAP S/4HANAA on-premise
- B. Conversion to SAP S/4HANAA Cloud Private Edition
- C. Conversion to SAP S/4HANAA Cloud Public Edition
- D. New Implementation
Answer: A
NEW QUESTION # 21
You are running an SAP ECC system .
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities? Note: There are 3 correct answers to this question.
- A. Perform an SAP S/4HANA conversion without DMO.
- B. Upgrade the SAP system.
- C. Use DMO for SUM.
- D. Apply SAP Support Packages.
- E. Perform an SAP S/4HANA conversion including DMO.
Answer: B,C,D
NEW QUESTION # 22
You are performing an in place SAP S/4HANA conversion including DMO.
What is the latest point in time when you can reset the procedure without losing business data?
- A. The end of the business downtime
- B. The end of the database migration
- C. The start of the Execution roadmap step
- D. The start of the business downtime
Answer: A
NEW QUESTION # 23
When using the DMO of SUM, which files can be handled by SUM in the download directory? Note:
There are 2 correct answers to this question.
- A. Parameter file SAPup_add.par
- B. Stack XML file calculated by the maintenance planner
- C. MIGRATE_DT_DUR.XML file from a previous run
- D. Breakpoint configuration file SAPUPPHAS.BRK
Answer: B,C
NEW QUESTION # 24
You are performing an SAP S/4HANA conversion.
When does the silent data migration (SDM) take place using the SUM defaults?
- A. During the Post processing roadmap step
- B. Before the start of the SUM technical downtime
- C. After SUM has ended
- D. During the Preprocessing roadmap step
Answer: C
NEW QUESTION # 25
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.
- A. Prerequisite check
- B. Benchmark tool
- C. DMO without system update
- D. SAP S/4HANA conversion without DMO
- E. SAP S/4HANA conversion including DMO
Answer: A,D,E
NEW QUESTION # 26
You are performing an SAP S/4HANA conversion with scenario strategy Standard. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question.
- A. TABIM UPG
- B. TABIM_SHADOW_INC
- C. PARMVNT_UPG
- D. PARDIST_SHD
Answer: A,C
NEW QUESTION # 27
Which of the following are valid options to check the progress of an in place SUM DMO run? Note:
There are 2 correct answers to this question.
- A. Check logs for jobs starting with RSUPG SGEN in the SAP system.
- B. Check the log files written in the SUM directory, subdirectory a bap, subdirectory log
- C. Check the Charts Control Center in the SUM UL
- D. Check the dump size of the database export in the SUM directory, subdirectory a bap, subdirectory load.
Answer: B,C
NEW QUESTION # 28
What is the name of the additional server that is used for a transition to SAP S/4HANA Cloud Private Edition?
- A. Central Instance
- B. Migration Hub
- C. Migration Server
- D. Transition Server
Answer: C
NEW QUESTION # 29
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. The Si checks are executed in the development system and the results are transported into the subsequent systems.
- B. The errors from the SI checks must be solved; otherwise, SUM will report an error.
- C. You need to build up an SI check framework by applying SAP Notes.
- D. You need an SAP system based on AS ABAP 7.52 or above for the SI check framework.
Answer: B,C
NEW QUESTION # 30
During the upgrade of your development system, you run into the adjustment of non-dictionary objects, handled by transaction SPAAU. There you find programs that are shown in status "automatic adjustment" (green traffic light).
What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?
- A. Before continuing with the next phase, SUM asks for a modification adjustment transport.
- B. SUM refuses to continue unless you have marked a transport request as modification adjustment transport.
- C. SUM continues with the next phase, and the coding of your modified objects are set to the new SAP standard.
- D. SUM continues with the next phase and your modifications are kept as in the start release.
Answer: A
NEW QUESTION # 31
How does SUM recognize modification adjustment transports from predecessor systems?
- A. By searching for transport requests that are assigned to project SAP ADJUST
- B. By searching for transport requests in file umodauto.lst
- C. By searching for transport requests in DIR_TRANS, subdirectory "transport"
- D. By searching for transport requests named <sid>KO<number>
Answer: B
NEW QUESTION # 32
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system before SUM continues? Note: There are 2 correct answers to this question.
- A. Release the transport request containing the modification adjustment.
- B. Create new versions of the objects you need to adjust.
- C. Manually activate the adjusted dictionary objects.
- D. Assign the transport request as a modification adjustment transport.
Answer: B,D
NEW QUESTION # 33
......
SAP E-S4CON-2505 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
Share Latest E-S4CON-2505 DUMP Questions and Answers: https://pdfexamfiles.actualtestsquiz.com/E-S4CON-2505-test-torrent.html

