NEW QUESTION # 11
True or False: Scrum events can be further enhanced by applying flow-based practices.

  • A. FALSE
  • B. TRUE

Answer: B


NEW QUESTION # 12
What does the Work Item Aging chart show? (Choose the best answer)

  • A. How many sprints ago has the team revised their WIP limits.
  • B. For each item on the Kanban board how long ago has it been pulled into WIP.
  • C. How many days has the team worked without breaching the WIP limits.
  • D. The approximate average age of work in process in the team.

Answer: B


NEW QUESTION # 13
True or False: The Developers always have ownership of the definition of "Workflow" regardless of whether it encompasses flow inside and/or outside of the Sprint.

  • A. FALSE
  • B. TRUE

Answer: A


NEW QUESTION # 14
Which of these metrics is most valuable for Sprint Planning? (Choose the best answer)

  • A. Points Delivered.
  • B. Throughput.
  • C. Work Item Age.
  • D. Cycle time.

Answer: B


NEW QUESTION # 15
How does setting limits to Work in Progress (WIP) policies support self-management? (choose the best two answers)

  • A. A Scrum Master defines a WIP Limit to help the Scrum Team self-manage.
  • B. WIP Limits creates a boundary for which the Scrum Team self-manages within.
  • C. WIP Limits inhibit self-management since they limit the team's autonomy to pull work.
  • D. As part of self-management Scrum Teams figure out their own WIP Limits.

Answer: B,D


NEW QUESTION # 16
True or False: Scrum Events, Scrum Team Accountabilities, and Scrum Artifacts are augmented when using Scrum with Kanban. For example, having a clear indicator of the age of active Sprint Backlog items may help the Scrum Team during the Daily Scrum, helping them to better Inspect and Adapt their daily work.

  • A. True
  • B. False

Answer: A


NEW QUESTION # 17
According to Little's Law, which of the following statements is true if a team reduces its Work in Progress (WIP) limit? (choose the best two answers)

  • A. In a given time period, the average number of Product Backlog items (throughput) completed will likely increase.
  • B. Value of each backlog item completed likely will go up.
  • C. Average time between starting and finishing (cycle time) of Product Backlog items will likely decrease.
  • D. Quality of work completed will likely increase.

Answer: A,C


NEW QUESTION # 18
Which of the following will help a Scrum Team achieve flow optimization? (choose the best 4 answers)

  • A. Active management of work items in progress.
  • B. Visualization of the workflow
  • C. Limiting WIP.
  • D. Padding estimates to allow space in the Sprint Backlog.
  • E. Inspecting and adapting their definition of "Workflow".

Answer: A,B,C,E


NEW QUESTION # 19
A Scrum Team has a Service Level Expectations (SLE) of 85% work items completed in eight days or less.
What is the likelihood of a work item to meet the 8-day SLE cycle if it has just surpassed the 50th percentile workflow stage? (choose the best answer)

  • A. The likelihood of meeting the team's SLE decreases.
  • B. The level of confidence to finish the item cannot be forecasted at this point.
  • C. The likelihood of meeting the team's SLE increases.
  • D. Nothing changes. The level of confidence to meet the SLE remains at 85%.

Answer: D


NEW QUESTION # 20
What are desired benefits of applying Kanban practices in a Scrum Team? (choose the best four answers)

  • A. Scrum Teams are no longer limited by Sprint time-boxes.
  • B. Scrum Teams can release larger increments in a shorter period of time.
  • C. Removes the need for the Sprint Review resulting in a higher velocity.
  • D. Uncovering areas of improvement within the Sprint.
  • E. Increased transparency on the Work in Progress (WIP) state of the work items.
  • F. For a work item, the average cycle time may be reduced.
  • G. Increased collaboration between the Developers.

Answer: D,E,F,G


NEW QUESTION # 21
True or False: Cycle Time is a lagging indicator.

  • A. True
  • B. False

Answer: A


NEW QUESTION # 22
True or False: A team's future performance can be determined by using Little's Law. (Choose the best answer)

  • A. FALSE
  • B. TRUE

Answer: A


NEW QUESTION # 23
Which formula best represents Little's Law? (choose the best answer)

  • A. Average Throughput = Average Cycle Time * Average Work in Progress.
  • B. Average Throughput = Average Cycle Time / Average Work in Progress.
  • C. Average Cycle Time = Average Work in Progress / Average Throughput.
  • D. Average Work in Progress = Average Cycle Time / Average Throughput.

Answer: C


NEW QUESTION # 24
True or False: Components of the Scrum framework needs to be adapted when Scrum Teams start using Kanban. Choose only ONE best answer.

  • A. FALSE
  • B. TRUE

Answer: A


NEW QUESTION # 25
A Kanban board is comprised of which of the following policies? (choose the best two answers)

  • A. Class of service policy.
  • B. Each Product Backlog Item type has a separate swim lane.
  • C. Work in Progress (WIP) Limits.
  • D. Your workflow visualization.

Answer: C,D


NEW QUESTION # 26
The basic metrics of flow that Scrum Teams using Kanban will need to track are: (choose the four best answers)

  • A. Cycle Time
  • B. Velocity
  • C. Work Item Age
  • D. Lead Time
  • E. Throughput
  • F. Work in Progress (WIP)

Answer: A,C,E,F


NEW QUESTION # 27
True or False: 'On-demand' work item place holders are used in place of Sprint Goals for Scrum Teams using Kanban. Choose only ONE best answer.

  • A. FALSE
  • B. TRUE

Answer: A


NEW QUESTION # 28
Which flow metric is most helpful in indicating when multiple Product Backlog items can be completed? (choose the best answer)

  • A. Work in Progress (WIP).
  • B. Throughput.
  • C. Work Item Age.
  • D. Cycle Time.

Answer: B


NEW QUESTION # 29
Which one of the following concepts does the Just-In-Time (JIT) method advocate? (choose the best answer)

  • A. Processes are triggered by a pull request based on demand.
  • B. Processes are initiated by a push request based on requirements.
  • C. Upstream processes run simultaneously with downstream processes.
  • D. The use of requirement planning to the maximum resource capacity.

Answer: A


NEW QUESTION # 30
True or False: Work Item Age is a leading indicator for the length of the Scrum Team's feedback loop for that (in progress) item.

  • A. True
  • B. False

Answer: A


NEW QUESTION # 31
Which is the best description of probabilistic forecast? (choose the best answer)

  • A. A forecast based on empirical data as an input on the likelihood of achieving a goal given certain time period.
  • B. A commitment of when a specific scope will be finished.
  • C. A formula that calculates a team's future performance.

Answer: A


NEW QUESTION # 32
Which two items would you expect to see in a service level expectation (SLE)? (choose the best two answers)

  • A. A period off elapsed day
  • B. A forecasted date
  • C. A probability
  • D. A cost of engineering

Answer: A,C