NEW QUESTION # 11
True or False: Scrum events can be further enhanced by applying flow-based practices.
- A. FALSE
- B. TRUE
Answer: B
NEW QUESTION # 12
What does the Work Item Aging chart show? (Choose the best answer)
- A. How many sprints ago has the team revised their WIP limits.
- B. For each item on the Kanban board how long ago has it been pulled into WIP.
- C. How many days has the team worked without breaching the WIP limits.
- D. The approximate average age of work in process in the team.
Answer: B
NEW QUESTION # 13
True or False: The Developers always have ownership of the definition of "Workflow" regardless of whether it encompasses flow inside and/or outside of the Sprint.
- A. FALSE
- B. TRUE
Answer: A
NEW QUESTION # 14
Which of these metrics is most valuable for Sprint Planning? (Choose the best answer)
- A. Points Delivered.
- B. Throughput.
- C. Work Item Age.
- D. Cycle time.
Answer: B
NEW QUESTION # 15
How does setting limits to Work in Progress (WIP) policies support self-management? (choose the best two answers)
- A. A Scrum Master defines a WIP Limit to help the Scrum Team self-manage.
- B. WIP Limits creates a boundary for which the Scrum Team self-manages within.
- C. WIP Limits inhibit self-management since they limit the team's autonomy to pull work.
- D. As part of self-management Scrum Teams figure out their own WIP Limits.
Answer: B,D
NEW QUESTION # 16
True or False: Scrum Events, Scrum Team Accountabilities, and Scrum Artifacts are augmented when using Scrum with Kanban. For example, having a clear indicator of the age of active Sprint Backlog items may help the Scrum Team during the Daily Scrum, helping them to better Inspect and Adapt their daily work.
- A. True
- B. False
Answer: A
NEW QUESTION # 17
According to Little's Law, which of the following statements is true if a team reduces its Work in Progress (WIP) limit? (choose the best two answers)
- A. In a given time period, the average number of Product Backlog items (throughput) completed will likely increase.
- B. Value of each backlog item completed likely will go up.
- C. Average time between starting and finishing (cycle time) of Product Backlog items will likely decrease.
- D. Quality of work completed will likely increase.
Answer: A,C
NEW QUESTION # 18
Which of the following will help a Scrum Team achieve flow optimization? (choose the best 4 answers)
- A. Active management of work items in progress.
- B. Visualization of the workflow
- C. Limiting WIP.
- D. Padding estimates to allow space in the Sprint Backlog.
- E. Inspecting and adapting their definition of "Workflow".
Answer: A,B,C,E
NEW QUESTION # 19
A Scrum Team has a Service Level Expectations (SLE) of 85% work items completed in eight days or less.
What is the likelihood of a work item to meet the 8-day SLE cycle if it has just surpassed the 50th percentile workflow stage? (choose the best answer)
- A. The likelihood of meeting the team's SLE decreases.
- B. The level of confidence to finish the item cannot be forecasted at this point.
- C. The likelihood of meeting the team's SLE increases.
- D. Nothing changes. The level of confidence to meet the SLE remains at 85%.
Answer: D
NEW QUESTION # 20
What are desired benefits of applying Kanban practices in a Scrum Team? (choose the best four answers)
- A. Scrum Teams are no longer limited by Sprint time-boxes.
- B. Scrum Teams can release larger increments in a shorter period of time.
- C. Removes the need for the Sprint Review resulting in a higher velocity.
- D. Uncovering areas of improvement within the Sprint.
- E. Increased transparency on the Work in Progress (WIP) state of the work items.
- F. For a work item, the average cycle time may be reduced.
- G. Increased collaboration between the Developers.
Answer: D,E,F,G
NEW QUESTION # 21
True or False: Cycle Time is a lagging indicator.
- A. True
- B. False
Answer: A
NEW QUESTION # 22
True or False: A team's future performance can be determined by using Little's Law. (Choose the best answer)
- A. FALSE
- B. TRUE
Answer: A
NEW QUESTION # 23
Which formula best represents Little's Law? (choose the best answer)
- A. Average Throughput = Average Cycle Time * Average Work in Progress.
- B. Average Throughput = Average Cycle Time / Average Work in Progress.
- C. Average Cycle Time = Average Work in Progress / Average Throughput.
- D. Average Work in Progress = Average Cycle Time / Average Throughput.
Answer: C
NEW QUESTION # 24
True or False: Components of the Scrum framework needs to be adapted when Scrum Teams start using Kanban. Choose only ONE best answer.
- A. FALSE
- B. TRUE
Answer: A
NEW QUESTION # 25
A Kanban board is comprised of which of the following policies? (choose the best two answers)
- A. Class of service policy.
- B. Each Product Backlog Item type has a separate swim lane.
- C. Work in Progress (WIP) Limits.
- D. Your workflow visualization.
Answer: C,D
NEW QUESTION # 26
The basic metrics of flow that Scrum Teams using Kanban will need to track are: (choose the four best answers)
- A. Cycle Time
- B. Velocity
- C. Work Item Age
- D. Lead Time
- E. Throughput
- F. Work in Progress (WIP)
Answer: A,C,E,F
NEW QUESTION # 27
True or False: 'On-demand' work item place holders are used in place of Sprint Goals for Scrum Teams using Kanban. Choose only ONE best answer.
- A. FALSE
- B. TRUE
Answer: A
NEW QUESTION # 28
Which flow metric is most helpful in indicating when multiple Product Backlog items can be completed? (choose the best answer)
- A. Work in Progress (WIP).
- B. Throughput.
- C. Work Item Age.
- D. Cycle Time.
Answer: B
NEW QUESTION # 29
Which one of the following concepts does the Just-In-Time (JIT) method advocate? (choose the best answer)
- A. Processes are triggered by a pull request based on demand.
- B. Processes are initiated by a push request based on requirements.
- C. Upstream processes run simultaneously with downstream processes.
- D. The use of requirement planning to the maximum resource capacity.
Answer: A
NEW QUESTION # 30
True or False: Work Item Age is a leading indicator for the length of the Scrum Team's feedback loop for that (in progress) item.
- A. True
- B. False
Answer: A
NEW QUESTION # 31
Which is the best description of probabilistic forecast? (choose the best answer)
- A. A forecast based on empirical data as an input on the likelihood of achieving a goal given certain time period.
- B. A commitment of when a specific scope will be finished.
- C. A formula that calculates a team's future performance.
Answer: A
NEW QUESTION # 32
Which two items would you expect to see in a service level expectation (SLE)? (choose the best two answers)
- A. A period off elapsed day
- B. A forecasted date
- C. A probability
- D. A cost of engineering
Answer: A,C